Timber wall framing inside a house under construction

Quantity Surveyor Hawke's Bay

Napier and Hastings are two councils, one plain and a lot of rebuilding since Cyclone Gabrielle. Send us your plans and get the job measured and priced for a fixed fee.

Fixed-fee quotes

Reports within 48 hours of quote approval

Nationwide, from plans

In short: we price building work across Napier, Hastings, Havelock North and the rest of the Bay, straight from the drawings. Builders get priced BOQs to tender with, trades get take-offs for their part of the job, and homeowners get a cost estimate for a new home, repair or extension. You get a fixed-fee quote first, then most reports within 48 hours of saying yes. There’s no need for a site visit on plan-based work. Upload your plans and tell us the deadline.

Building in Hawke’s Bay: what affects your costs

Council and consenting in Hawke’s Bay

Napier City Council handles consents in Napier, and Hastings District Council covers Hastings, Havelock North, Flaxmere, Clive and the rural district. The two councils share a Future Development Strategy that plans where new housing goes. For flood risk, both rely on modelling from Hawke’s Bay Regional Council, and that work is still being rolled out. The regional council posted updated flood maps for the Esk Valley, Whirinaki and parts of Bay View in 2026, with more areas due into 2027. That information feeds into building consents and LIMs, so a site’s requirements can change as the maps do. Send your LIM or any hazard notes with the plans.

Ground, climate and site conditions

Cyclone Gabrielle in February 2023 changed a lot here. Properties were sorted into land categories. Category 1 was retired in December 2025, and the Category 3 areas, where risk was judged too high, are being phased out as better modelling arrives. For a rebuild or new build on a flood-affected site, that can mean raised floors, specific foundations or extra drainage, and those are real costs. History matters too. The 1931 earthquake lifted the coast around Napier by roughly two metres and turned Ahuriri Lagoon into dry land, and much of low-lying Napier sits on that raised ground. The Heretaunga Plains between the two cities are layered gravels, sands and silts laid down by the rivers, and your engineer’s ground report decides what foundation you need.

Access, freight and trades

Most sites are flat and easy to reach. Rural and coastal jobs out towards Haumoana, Te Awanga or up the Esk take longer to service, so let us know about access.

Project types we price in Hawke’s Bay

  • Flood repairs and rebuilds. Homes damaged in Gabrielle being repaired, lifted or rebuilt. We price from the engineer’s scope, including raised floors and new foundations.

  • 1930s and older homes. Art Deco and Spanish Mission-era houses and bungalows. Matching period details costs more than standard finishes.

  • New homes in growth areas. Iona and Brookvale in Havelock North, Lyndhurst in Hastings and Parklands in Napier. Subdivision covenants often set the spec.

  • Lifestyle and orchard properties. Homes and sheds on the Heretaunga Plains, with longer services runs and on-site water or wastewater.

  • Coastal homes. Westshore, Haumoana and Te Awanga, where sea spray lifts the fixings and cladding spec.

Quantity surveying services for Hawke’s Bay projects

Builder estimates and priced BOQs

A full list of quantities you can put rates on and tender. Good for builders juggling repair jobs and new builds at once.

Priced BOQs for Hawke’s Bay builders

Trade and subcontractor take-offs

Your trade only. Cladders, roofers, painters and concreters get the quantities they need.

Take-offs for Hawke’s Bay subbies

New build cost estimates

Know what a new home in Havelock North or Napier will cost before you sign.

New build estimates in Hawke’s Bay

Renovation and extension costings

Budget the repair, reno or extension, or get a second opinion on a quote.

Hawke’s Bay renovation and extension costings

Suburbs and growth areas we cover in Hawke’s Bay

We price right across both cities and the wider Bay. Some of the areas:

  • NapierAhuriri, Westshore, Taradale, Greenmeadows, Tamatea, Marewa, Bay View
  • HastingsMahora, Akina, Flaxmere, Frimley
  • Havelock North and villagesHavelock North, Clive, Haumoana, Te Awanga

Growth areas

  • Iona, Havelock North: a new residential development being built in stages, with titles issued for the first stages.

  • Brookvale, Havelock North: a new urban development area Hastings District Council is opening up in stages.

  • Lyndhurst, Hastings: a residential growth area on the city’s north-west side, named in the joint development strategy.

  • Parklands, Napier: Napier’s main new subdivision, still selling and building.

…and anywhere in Hawke’s Bay, from plans.

How our remote QS service works for Hawke’s Bay projects

Step 1: Send your plans

Upload drawings, specs, the engineer’s report and your LIM or hazard notes if you have them.

Step 2: Get a fixed-fee quote

A single price for the job. No hourly rates, and no obligation.

Step 3: Receive your report

Most are back within 48 hours of approval. Bigger jobs can take longer, and we’ll say so first.

We don’t have a Hawke’s Bay office. For a flood-affected site, the engineer’s design and hazard information matter far more to the price than a site visit would. If your lender or insurer wants someone on site, ask us before you book.

Why Hawke’s Bay builders use The QS Guys

Fixed fee

Agreed before any work starts.

Quick reports

Most within 48 hours of approval.

Clear line items for repair scopes

Useful when owners, engineers and builders all need to read the same numbers.

Hawke’s Bay quantity surveyor FAQs

Can you price a rebuild after Cyclone Gabrielle?

Yes, from the plans and the engineer’s scope. If floor levels or foundations have to change because of the flood risk, we price what’s been designed. Anything not yet designed goes in as a clear allowance.

My property is in a flood-mapped area. What does that mean for cost?

It depends on what the council requires for your site. Raised floors, specific foundations and more drainage are the usual cost drivers. Check your LIM and send us the design once it responds to the hazard.

Do you cover both Napier and Hastings?

Yes, and Havelock North, Clive and the rural areas too. The two councils have different processes, but that doesn’t change pricing from plans.

Can you price a new home in Iona or Brookvale?

Yes. Send the plans with the subdivision covenants. Covenants often lock in cladding, roofing and landscaping, and we price to them.

Do you visit sites in Hawke’s Bay?

Not for plan-based work. If your job needs someone on site, ask us before you commit.

How much does a QS report cost in Hawke’s Bay?

It depends on the size and detail of the plans. You’ll get a fixed fee first, with no obligation to go ahead.

Get a fixed-fee quote for your Hawke’s Bay project